I projected one of the red climbs (the second easiest level) and got up all the way. I followed the parkour rule of "once is never, twice is coincidence, third time you got it" and did it a couple more times, by which point it was easy. I did a second red that I had tried before and that was fine as well - it was just the hight. I even did a green one, which is the third easiest. I think it was a pretty easy green, but still I was happy with myself. I kind of like the idea of finding something that's a problem that is doable but needs work and then projecting it. I'm going to keep going with it and see how much I can improve.
One of my rowing friends emailed and asked if I wanted to go to this rowing studio that does a steady state row followed by stretching on Sundays, so I've done that a couple of times. The first time we had one of the owners instructing and it was really good because she did a lot of technique coaching. The second time it was a substitute of someone who we know from rowing and she did more rowing and a few directions from her rower, and I rowed 10K! It was intense. After we went out for brunch which was really nice.
I went on a couple dips this week and the water is down to 51. I've just been going in for like 10 minutes and hanging out. I know I'm going to have to get back to swimming at some point, but it's so darn cold! I have to do it a little more often, even if I'm going at lunch by myself. Yesterday for the first time this fall I brought my full set up with dryrobe, heated gloves and vest, bucket and hot water and gloves and booties. We had a pretty big group that went for a sunset dip and it was so nice at the water, it almost made up for it being freezing! Last year I swam a half mile at this temp, though I will say that it was sunnier on that day. It's supposed to be nice later in the week, so I will see what I can maybe do.
I'm deep in the process of remodeling my bathroom. I've had three contractors come in and look at the project and two have given me estimates. I've got everything except the tiles picked out, and I'm feeling close on that. I'm talking to contractor #3 tomorrow, I actually like him the best, so I hope he will give me an estimate soon. It's my first grown up house project, and while it can feel a little overwhelming, it's also been fun choosing my stuff and deciding what I want (which did take a little work to get to). Anyhow, I hope the city and the condo association won't be a huge pain, and that my new bathroom will be beautiful (of course, then I'm just going to put a litter box in it and such, but what can you do?